Page 30 - CFJ_Apr26
P. 30

THOUGHT LEADERSHIP


             building regulations. For building owners   of fossil fuels. These must also be reviewed   higher market value than one with a lower
             this means their assets are better   at different stages of the project.   sustainability rating, or no rating at all. It
             protected against climate change and the   Water and air quality and biodiversity   also means that the building elements will
             asset value of their buildings is increased   are also key elements of the assessment.   last longer, will be easier to maintain and
             through having a BREEAM rating.    Before Version 7 the designer would gain   repair, more energy-efficient and will have
              Instead of prioritising operational carbon,   credits by meeting the UK Biodiversity Net   a lower cost of maintenance. With current
             BREEAM now requires designers to look at   Gain legislation (BNG), but now credits   trends such as designing for disassembly
             the whole carbon life cycle of the building.   are only given if the project exceeds the   the residual value of the building at the end
             This is a significantly broader and longer-  limits of the scheme. BNG ensures that   of its life will be higher because many of
             term approach than before and includes   habitats for wildlife are left in a measurably   the materials and components can be sold
             the environmental impact of extraction   better state than they were before the   for reuse or recycling, thereby reducing and
             and processing of raw materials, energy   development and it is now a standard part   offsetting disposal costs.
             used for manufacturing and transport,   of the town and country planning act.  It goes without saying manufacturers
             the amount of carbon embodied in the   The ideal is to provide buildings that   will need to offer the most sustainable
             materials themselves, the lifespan of the   enhance the environment and make it   products, but they will also need to provide
             product and the environmental impact of   better, rather than the original approach of   a high standard of technical support
             maintenance, repair, demolition, recycling   accepting that buildings will be damaging   including documentation and independent
             and disposal.                      and limiting as far as possible the extent   certification to the required standards.
              They assess the lifecycle impact   of that damage. Using a timber floor that   It’s not unusual also for manufacturers to
             of the project at three critical stages:   has a sustainability certificate such as   need to provide evidence of their corporate
             concept design, technical design, and   FSC (Forest Stewardship Council) or PEFC   social responsibility and anti-slavery
             post construction. From our perspective   (Programme for the Endorsement of Forest   policies, and evidence that they support
             in the flooring industry this could mean   Certification) means the forests where the   the communities where they are based
             designers favouring solid timber floors,   timber was grown are properly managed   and where they work. The same applies to
             from sustainably managed sources. As it   and water and air quality and biodiversity   contractors.
             grows the tree collects carbon from the   are protected.                 Contractors will also need to provide
             atmosphere, locking it away so it cannot   Human health and comfort are given   ‘as built’ evidence that they have installed
             increase global warming.           higher priority than before and again a solid   the products correctly and they’ll be part
              Compared with other building materials   timber floor can be a good option due to   of regular checks that ensure carbon and
             this is a rare and significant benefit. When   its low levels of VOCs and tendency not to   energy targets are being met as the project
             made into a solid wood floor its long life   harbour dust and mites.   proceeds. They’ll also need to show their
             span means the carbon is ‘locked up’ for   Compared with the previous version,   site practices are sustainable in terms of
             many years and when it is disposed of the   BREEAM v7 will require designers to   their choice of plant, energy use and how
             nett effect upon global warming is minimal   engage with sustainability consultants   they deal with waste and recycling.
             to zero.                           at an earlier stage than before. They’ll   In their new Version 7, BREEAM has
              In order to achieve ‘Excellent’ or   also need to carry out assessment and   created a scheme that demands close
             ‘Outstanding’ BREEAM ratings the building   modelling at an earlier stage and more   collaboration between design and
             needs to meet recognised embodied   frequently than before.            construction teams and to make clients
             carbon benchmarks. Clients are invited   For clients the up-front costs will be   think about creating buildings that
             to adopt existing industry-recognised   higher because of the need to engage   enhance the environment rather than
             benchmarks and to demonstrate that   consultants in the early stages of the   merely settling for damage- limitation. An
             the project complies. In addition, the   project. It may mean also that the   ambitious move perhaps, but a reflection
             designer must create models for energy   materials, products and processes   of where the construction industry, and
             consumption and carbon emissions from   specified by the designer will be more   therefore the flooring industry is going.  
             the early stages of the process and show   expensive. However, the upside of this     Richard Aylen is technical manager,
             to what extent they’re eliminating the use   is that the finished building will have a   Junckers


























         30  CFJ April 2026                                                                       www.contractflooringjournal.co.uk
                                                                                                            @CFJMagazine
   25   26   27   28   29   30   31   32   33   34   35