            Fast-track flooring installations in educational facilities
               LOORING contractors installing   Preparing smooth subfloors          appropriate floorcoverings. The choice
            Ffloorcoverings in schools, colleges   Once it’s determined the subfloor is   of adhesive will often be determined
            and universities often face severe time   dry enough to proceed or a moisture   foremost by what type of floorcoverings
            constraints, frequently having to complete   management solution is in place, a   are being installed and where, but there
            a project over a weekend or during a   smoothing compound should be applied to   are options for when timesaving is a
            short school holiday. Fortunately, fast-  create a perfectly smooth surface for the   priority.’
            track subfloor preparation and flooring   receipt of new floorcoverings and prevent   Vinyl, which is easy to clean and
            installation products are now available   imperfections affecting the finished   maintain, is popular in educational
            that enable areas to be brought into use in   installation.             facilities, and is best adhered by an
            as little as a day.                   In some areas of schools, colleges and   adhesive with good initial tack and high
              Just as with any other flooring   universities, such as corridors, floors   final bond strength. Nowadays, acrylic
            installation, a thorough assessment of the   will be expected to receive high levels of   and vinyl adhesives are available that
            subfloor should be completed before any   daily foot traffic, so using a high-strength   build up a strong enough bond to allow for
            work begins when installing floorcoverings   smoothing compound will help ensure   foot-traffic in less than an hour after the
            in an educational setting.          long-term durability of the installation.  application of floorcoverings.
              Its end use and other environmental   Fast-track smoothing compounds that   Carpet tiles are another popular choice
            factors should also be considered – floors   are 'walk-on' hard in 30 minutes and   for areas such as libraries or common
            will be expected to endure high volumes   ready to receive new floorcoverings from   rooms, not least for their ability to be
            of daily foot traffic while remaining secure   45 minutes are also available, allowing   removed and replaced if individual tiles
            and hygienic for years to come. This   installations to proceed faster than ever.  become worn or damaged.
            necessitates following best practice in   High performance smoothing      For this reason, carpet tile tackifiers
            subfloor preparation and using suitable   compounds that can be applied directly   are available that, once applied, only take
            products.                           over bitumen and adhesive residues also   30 minutes to form a permanently tacky
            Safeguarding against moisture       offer significant timesaving benefits for   film that prevents the tiles from moving
                                                contractors undertaking refurbishment
            Excess subfloor moisture, whether   projects to a deadline.             laterally under everyday traffic, while
            residual construction moisture or rising   One such product, F Ball’s Stopgap   allowing individual sections to be lifted
            damp, can attack floorcoverings and   1200, reportedly takes as little as 60   and replaced with ease.
            adhesives – it’s a leading cause of floor   minutes to set and is ready to receive   It’s always advisable to check the
            failure. This can lead to the movement of   floorcoverings from as little as four hours.   compatibility of particular floorcoverings and
            floorcoverings and the growth of mould   ‘In most applications, including when it’s   adhesives. To do this, contractors should
            and bacteria, which can potentially cause   applied over old adhesive residues, it’s   consult the adhesive manufacturer’s
                                                                                    Recommended Adhesives Guide or see the
            a health risk to people in the immediate   not essential to prime beforehand, saving
            environment, as well as being a potential   further time,’ says the company.  floorcovering manufacturer’s guidelines. 
            trip hazard.                                                              www.f-ball.co.uk
              To avoid these problems, a moisture   Choosing the right adhesive
            measurement test should always be   ‘The contractor can then select a      Visit the BRAND LEADERS section on our
                                                                                       website to read more from F Ball and Co
            conducted using a calibrated digital   suitably fast-working adhesive to install
            hygrometer before any flooring
            installation, in old and new buildings.
              If Relative Humidity (RH) levels exceed
            75%, or 65% when installing wooden
            floorcoverings, a moisture management
            solution will be required to stop
            excess subfloor moisture damaging
            floorcoverings and adhesives and
            potentially causing floor failure.
              Water-based moisture management
            systems, which are ideal for biologically
            sensitive school settings, are now
            available that create an effective barrier
            against residual construction moisture and
            rising damp where RH levels up to 95%,
            with a drying time of under two hours.
              Further advancements in flooring
            technology mean that single-coat epoxy
            waterproof surface membranes that
            provide protection against RH levels as
            high as 98% are also available in fast-
            drying formulations that save valuable
            time.                                                                                            Stopgap F77


            www.contractflooringjournal.co.uk                                                                          107
            @CFJMagazine                                                                                 CFJ February 2026
   102   103   104   105   106   107   108   109   110   111   112