                     Using a real-life example on the best course of action for a particular flooring project,
                              Jason provides a heavy-duty solution for a heavy-duty environment



                 LOORS often have to contend with   leaking from the freezers, or indeed if   promote the application characteristics
              Fhigh levels of foot traffic and heavy   standing water was the cause of the high   of levelling compounds when applied
              loads while retaining their integrity and   subfloor moisture reading. We therefore   to non-absorbent surfaces, including
              aesthetic appearance. In some areas,   recommended a belt and braces   waterproof surface membranes.
              such as entranceways, a heavy-duty   approach to ensuring the installation   The remaining area of the floor could
              installation may be required to withstand   would be capable of withstanding   be primed using F Ball’s Stopgap P131
              other adverse conditions, including being   expected conditions for many years to   general-purpose primer.
              subject to surface moisture.       come.                               When the primers were dry,
                This was the case where we were    First, it would be necessary to remove   contractors were advised to apply a
              recently called to recommend steps for   all existing floorcoverings, levelling   minimum 3mm thickness of Stopgap
              refurbishing floors at a cash and carry.  compounds and adhesive residues from   Green Bag levelling compound to
              Assessment                         the subfloors, along with any other   create a perfectly smooth base for
              As the store was still in operation, only                             floorcoverings.
              a limited inspection of the floor could                                Once cured, the fast-setting, low-
              be carried out. However, the removal                                  odour, protein-free levelling compound
              of a few existing vinyl tiles revealed the                            has a high strength, making it suitable
              subfloor was a concrete base with a
              power float finish and had a total area of                            in areas subject to high foot traffic and
              about 800sq m. The heavy-duty nature                                  heavy, wheeled loads, such as the pallet
              of the environment was evidenced by a                                 trucks.
              pallet truck in operation at the time of                              Adhesive recommendation
              our visit.                                                            Given the possibility of the flooring being
                In the right half of the store, there were                          affected by water from the freezers, we
              signs of multiple floor failures that had                             advised installing new floorcoverings
              been temporarily repaired. It looked like                             using F Ball’s Styccobond F73 PLUS
              large freezers that were leaking could be                             heavy-duty adhesive, providing it’s
              causing issues. Fixed stanchions were                                 listed as compatible with the chosen
              located at each corner of the freezers.                               floorcoverings in the Recommended
                Moisture tests undertaken using                                     Adhesives Guide (RAG).
              a digital hygrometer indicated that   surface contaminants/treatments that   The solvent-free, moisture-curing
              subfloor relative humidity levels were   may impair adhesion. This could be   adhesive delivers the high bond strength
              92% in this area. In accordance with   achieved by mechanical means, such
              BS8203 Code of practice for installation   as shot blasting, leaving a clean, static,   required to hold in place a wide range
              of resilient floor coverings, floorcoverings   micro-textured finish. Any dust and   of textile and resilient floorcoverings,
              should not be installed where a moisture   debris would also need to be vacuumed   including rubber, vinyl, linoleum and
              test gives a relative humidity reading   away.                        synthetic grass, in areas that will be
              of more than 75% without a moisture   Application                     subject to heavy loads and high foot
              management solution in place.      A single coat of Stopgap F77 waterproof   traffic, as well as surface water.
                The left half of the store was created   surface membrane could then be applied   Once cured, it is resistant to water, oil
              as an extension of the original building   to the half of the floor where excess   and grease. Where movement joints are
              20 years ago. The floors were separated   subfloor moisture was detected to   located within the base, all preparation
              by an expansion joint. A small section of   create a barrier between the subfloor   products and floorcoverings would
              flooring was removed in this half of the   and the flooring installation. The product   need to be terminated either side of the
              building to reveal that adhesives were   should be applied using a 1.5mm x 5mm   joint and a proprietary movement joint
              unaffected by moisture. Again, large   v-notched trowel, before rolling with a   capping strip installed. If the stanchions
              freezers were situated in the area, with   pre-coated roller to achieve a continuous   were to be re-installed then these would
              fixed stanchions at the corners.   pinhole-free finish.               have to be sealed where fixed to the
              First steps                          Once the waterproof surface      floor to prevent an ingress of water. 
              Based on the available information,   membrane had cured, it was       01538 361633
              it couldn’t be determined for certain   recommended that the surface was   www.f-ball.co.uk
              whether floor failure was being caused   primed using F Ball’s Stopgap P141     Jason Tatton is a technical service officer
              by excess subfloor moisture or water   primer, which is specially designed to   at F Ball and Co