Page 10 - CFJ_Jul26
P. 10

InPerson


               They don’t want the
               responsibility if there’s a
               problem later, so if they
               come across anything on
               site that concerns them,
               they’ll call us straight
               away.
                 It’s all set out in the
               fitters’ handbook as
               well – the standards
               for preparation and the
               expectation that the
               floor is left perfect before
               installation. We also carry
               out site visits and sign                                                                  An engineered
                                                                                                         wood installation
               off the work once it’s                                                                    involving Ardex
               complete. At that point                                                                   latex and F Ball
               we’d notice any issues,                                                                   and Co adhesive
                                                                                                         at Sugar Quays in
               but in reality it’s very rare                                                             London.
               that anything significant          same week, which completely changed   the issues are caused by other trades –
               comes up. Everyone knows the rules and   our workload. Often it’s because of   for example a door bar being damaged,
               works to them.                     inspections, certification delays, or issues   a plumber moving a toilet slightly, or a

                                                  like plumbing leaks. When that happens,   kitchen unit panel being adjusted to fit
               How do you respond when programmes                                    an appliance. Charlotte and the ops team
               are shortened or changed at short   we try to stay flexible and see if we can   manage those situations and arrange
                                                  do prep work or move labour around so
               notice?
               In reality, we just have to respond to   the time isn’t completely lost.  any necessary visits.
               what the builders need. The ops team is
               used to managing constant changes, and   What is your process for dealing with   Which manufacturers would you like to
               we try to plan sensibly so we don’t order   defects or issues after completion?  give a particular shout out to?
               materials too early or commit labour   After installation, our team carries out   Cormar Carpets would definitely be
               before we’re confident the site is ready.  site sign-offs. If there’s anything obvious   number one for me. They were actually
                 It’s about having a presence on site and   at that stage, it’s flagged straight away.   the first account I ever opened when I
               trusting your instincts. If someone says   Otherwise, issues usually appear later   started the business, and I’ve worked
               a plot will be ready in two weeks but   through the customer snagging process   with them ever since. The products are
               you can see it’s really four or five weeks   when the homeowner moves in.  reliable, the quality is consistent, and
               away, you hold off ordering materials and   Those requests go to our customer   if there’s ever an issue it’s dealt with
               make a note in the diary instead. We use   care coordinator, Charlotte. She   quickly.
               a diary system with notes so everything   receives them from the site team and   Karndean is another company we’ve
               can be monitored and reviewed.     organises any follow-up work that’s   had a long relationship with. We’ve
                 Sometimes changes are unavoidable.   needed, usually supported by photos.   been using their products for more than
               Recently we had 16 flats and another six   To be honest, genuine defects in our   20 years and again, problems are very
               houses fall out of the programme in the   installation work are rare. More often   rare. If you provide feedback they take it
                                                                                     seriously and work with you to resolve
                                                                                     things.
                                                                                       Bostik adhesives have also been
                                                                                     excellent, particularly in the last few
                                                                                     years since we started using them more
                                                                                     regularly. The technical support and
                                                                                     reliability have been very good. There
                                                                                     are other suppliers we’ve worked with
                                                                                     over the years – Furlong, for example –
                                                                                     who’ve been really helpful. But if I had
                                                                                     to single out a few, Cormar, Karndean
                                                                                     and Bostik would definitely be my big
                                                                                     shout-outs. 

                                                                                        We’ve heard the answers
                                                                                       Paul Baker, director at Baker
                                                                                       Flooring, had to our light-hearted
                                                                                       The Floor is Yours column in CFJ June.
                                                                                       Next month he turns to more serious
               Helen with Adrian Doyle, who she met when he was commercial manager at Bloor Homes Southern. With Alex   questions in Trade Talk.
               Pearce, he later started a development company called Palady Homes, now a New Homes Flooring client. ‘It’s
               possible we love Adrian’s honey – which is his hobby,’ quips Helen.

         10  CFJ July 2026                                                                        www.contractflooringjournal.co.uk
                                                                                                            @CFJMagazine
   5   6   7   8   9   10   11   12   13   14   15